The pool is open year round (6am to 10pm). The air temperatur was -4 C (24 F) when the pictures were taken.
The heat is provided by a geothermo power plant (see post below).
Friday, January 11, 2008
Iceland Nesjavellir Geothermo Power Plant
The Numbers
Heat per year: 700 MW
Electricity per year: 30 MW
Hotwater pumped: 60 Million cubic meters (15 Billion Gallons)
Holes: 1000 to 2000 meters deep (3300 to 6600 feet)
Max temperatur measured: 380 degree Celcius (716 F)
Pipeline lengh: 23 Km (14 miles)
Temperatur drop: 2 degrees Celcius over 23 Km (4 F over 14 miles)
Total cost (1998): $140 Million
pipeline to Reykjavik
Heat per year: 700 MW
Electricity per year: 30 MW
Hotwater pumped: 60 Million cubic meters (15 Billion Gallons)
Holes: 1000 to 2000 meters deep (3300 to 6600 feet)
Max temperatur measured: 380 degree Celcius (716 F)
Pipeline lengh: 23 Km (14 miles)
Temperatur drop: 2 degrees Celcius over 23 Km (4 F over 14 miles)
Total cost (1998): $140 Million
pipeline to Reykjavik
pipelines from power plant
Subscribe to:
Posts (Atom)